Sunday, August 25, 2013

Freedom and Chaos

 Thought I should update the blog.  It has been so hectic that I haven't had time or access to the computer most of the time to do any posting.   There has been some positive progress made with the studio.  We are finally to the painting stage!!!!

 We did take a few days off last week and went camping in the mountains.  Camped at a friend's ranch.  The weather was great, had a heck of a thunderstorm on Sunday though.  Nothing like being in the mountains with lightning all around. It was a very enjoyable trip, just too short.  

It was a bit depressing to come back home to the chaos.  There is not a room in the house that hasn't been touched by the addition in some way. Dust abounds everywhere!!!!!  We took up the sticky plastic that we have had down on the carpet and replaced it with some fresh.  There is a plastic curtain hanging in the hallway until the sheet rock and texturing is completed.   I will be thrilled when it comes down permanently.  


                                   
  It remains folded up to the ceiling unless the dust is flying.  We took the wall out that separated the new addition from the rest of the house Tuesday night.  We decided we had waited long enough and why leave it to those guys.  We left the messy part up on the ceiling for the guys though.
  We had already removed one ceiling from a closet in the house when we remodeled 17 years ago and had an idea it would be a very big mess as they didn't believe in putting anything up there to hold the sheet rock and insulation up if there weren't any walls doing the job when the original house was built.  And that is exactly the way this one was, too.  

dyeing room
 The walls in the dyeing room have been painted once, need to paint the dark one again.  I really liked using the dark paint as it widened out the room and didn't make it feel so long and narrow.  As soon as that wall is painted, there will be some cabinets going up on the wall to the right.  My cabinet builder is ready and waiting anxiously for the moment.  

south end of  studio area
They will start on the underlayment in the areas where there is vinyl either tomorrow afternoon or Tuesday.  That will be a big day when it is completed 
as well as the base  cabinets can be set.  I hope it will continue to come together each week and be in the studio in a month's time.

The beams are being prepped for what they will become.  Will post the end result.  I think they will look pretty darned good when completed.  

The bricks were delivered on Wednesday and we picked up tile and vinyl yesterday in Denver.  The doors, counter top, and large window, providing it was ordered weeks ago (no faith in the guy that was suppose to order it and it was a mystery to the one guy at the lumber yard the other day when checked on), all should be here sometime this week.  

The stucco guys were here yesterday and put some of the chicken wire on the outside so that should be underway tomorrow as well.

 Of course all is not well as the a/c is leaking on the floor in the furnace room. That took a few phone calls to convince the installer that we knew what the heck we were complaining about.  Always have to have some wrinkle in the plan.

  Picked up the barn door hangers the other day so we can start building the doors once the cabinets are out of the wood shop.